Stiebel-eltron HDB-E Si 01.11.2012 - 31.01.2013 User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
20 | HDB-E Si www.stiebel-eltron.com
INSTALLATION
Installation
Flexible water connection lines
f If the appliance is installed with flexible water connection
lines, ensure that the pipe bends do not become twisted.
Pipe bends have a bayonet fitting and are installed inside the
appliance.
f Secure the back panel at the bottom with an additional
screw.
9.1 Installation site
!
Material damage
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically near the draw-off
point.
The appliance is suitable for undersink and oversink installations.
Note
The appliance must be fitted to a wall with sufficient
load-bearing capacity.
Undersink installation
26_02_02_1373
1
2
1 Cold water inlet
2 DHW outlet
Oversink installation
26_02_02_1374
12
1 Cold water inlet
2 DHW outlet
9.2 Factory settings
The appliances are prepared in the delivered condition:
- Power supply from “below”, installation on unfinished walls
- Water connection, installation on unfinished walls
10. Installation
This chapter describes installation in accordance with the factory
settings.
For further installation options, see chapter “Installation alterna-
tives”.
26_02_02_1367
f Open the appliance.
26_02_02_1101
f Press the two locking hooks and remove the lower part of
the back panel towards the front.
26_02_02_0810_
f Mark out the holes to be drilled; see chapter “Specification /
Dimensions and connections”.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 71 72

Comments to this Manuals

No comments